Page 3 of 4
Re: It has arrived
Posted: Fri Jun 16, 2023 7:47 am
by worth1
Concrete doesn't dry it cures.
The slower it cures the stronger it will be.
If it cures too fast it can sometimes crack.
The higher the psi of the concrete the hotter it will get and the faster it will cure.
I've put a water sprinkler on it to keep it cooled off.
Do you know what psi it is?
This has to do with how much cement was put in the mix.
Re: It has arrived
Posted: Wed Jun 21, 2023 4:20 am
by Whwoz
Second concrete pour went well today, was forecast to be about 1C/34F at sunrise with frost, but was 5C/41F, much more pleasant and only got better from there
IMG_20230621_094131_565.jpg
Pathway from veggie bed to house is now complete and curing.
A bit of an over estimation of requirements lead to a surplus of concrete, so we dumped 5 or 6 Barrow loads in what will be the footings for the compost bin expansion. This area was dug deeper than required and needed a bit of fill.
IMG_20230621_114930_725.jpg
A barrow and a half left went out at the entry of the drive in front of the pipe to aid drainage.
IMG_20230621_115101_300.jpg
Left a bit rough, but will fill with silt over time
Then fixed up the water supply into where the greenhouse will go.
IMG_20230621_133935_586.jpg
IMG_20230621_134003_782.jpg
Two entry points at front, one rear for misting system
Re: It has arrived
Posted: Wed Jun 21, 2023 8:17 pm
by MissS
That's great. I'm so happy that it is all coming together for you. It sure i s going to be a game changer.
Re: It has arrived
Posted: Sun Jul 02, 2023 6:09 pm
by Danny
Interesting to watch your build out, great pictures too!
Re: It has arrived
Posted: Sun Jul 02, 2023 8:22 pm
by Whwoz
While wew were away, the concretor was only able to inbox and cut the poured concrete. He was also able to box up the last of the compost bin footings and an area for a storage slab. 47.5 mm/1.9 inches of rain prevented any actual pouring of concrete. The only suitable day is today and all trucks are booked.
16883470634477583949994579827678.jpg
16883471541876590380058763760821.jpg
The actual greenhouse slab area is ready to be boxed, just waiting for the weather
16883472718014449953340382201003.jpg
Re: It has arrived
Posted: Mon Jul 03, 2023 7:16 am
by GoDawgs
OK, I just have to ask. Have you scratched your name or a date into the wet concrete anywhere?

Re: It has arrived
Posted: Mon Jul 03, 2023 7:20 am
by Whwoz
Not yet @GoDawgs . Our names and hand prints are in the last lot that we had poured about 5 years ago. Will be doing it in the main pad once it is poured. Have left plenty of room around the greenhouse footprint for it.
Re: It has arrived
Posted: Mon Jul 03, 2023 10:50 pm
by Whwoz
Started boxing up what will be a couple of raised beds off the walkway.
IMG_20230704_132243_915.jpg
Right hand side bed will be blueberries and Chilean guava, left will be Saffron and Strawberry plus whatever in the space left. It will join the main garden bed
IMG_20230704_132319_235.jpg
IMG_20230704_132302_821.jpg
Re: It has arrived
Posted: Mon Jul 03, 2023 10:59 pm
by Whwoz
While doing the boxing, a mulch truck turned up, so have started mulching the citrus trees
IMG_20230704_132348_587.jpg
IMG_20230704_132403_062.jpg
Re: It has arrived
Posted: Tue Jul 04, 2023 7:35 am
by GoDawgs
You're going to have one heck of a botanical garden when you're through!
Re: It has arrived
Posted: Wed Jul 05, 2023 2:25 am
by Whwoz
Next concrete pour is booked for Friday. Fingers crossed weather behaves itself.
Re: It has arrived
Posted: Wed Jul 05, 2023 6:07 am
by PlainJane
Will this theoretically be the finale for the concrete work?
Re: It has arrived
Posted: Wed Jul 05, 2023 6:11 am
by Whwoz
No, this is for the compost bin footings and storage slab. The greenhouse slab will be at least 2 truck loads, hopefully we can do it in one pour, but quite possibly need two simply due to truck availablity.
Re: It has arrived
Posted: Thu Jul 06, 2023 5:42 pm
by Whwoz
Concrete arrived on schedule, storage slab and compost bin footings done
16886831851908732862421742326904.jpg
16886832500504176735635759264301.jpg
1688683290039807498775187025223.jpg
Re: It has arrived
Posted: Thu Jul 06, 2023 8:42 pm
by Moth1992
Looking awesome!!
I can see why you need concrete. That mud is so mucky!
Re: It has arrived
Posted: Thu Jul 06, 2023 9:33 pm
by Whwoz
@Moth1992 , normally that mud is not there, but there is plenty of Kikuyu that grows through everything if not controlled sternly
Re: It has arrived
Posted: Thu Jul 06, 2023 9:45 pm
by MissS
This is pretty exciting. I'm enjoying watching the progress and as you, I can't wait to see it with the greenhouse slab done.
Re: It has arrived
Posted: Thu Jul 06, 2023 11:47 pm
by Whwoz
@MissS , I can't wait either. Should be poured Wednesday or Thursday everything being equal and weather forecast staying like it is
Re: It has arrived
Posted: Thu Jul 06, 2023 11:51 pm
by Whwoz
16887052807262861742455392766463.jpg
Two more loads of mulch have turned up and already started to spread some of it. Seven of 10 citrus trees have mulch around them now. Need to see how my cardboard stocks are holding up before we spread more.
Re: It has arrived
Posted: Mon Jul 10, 2023 4:22 am
by Whwoz
Managed to scrape up enough cardboard to get at least half a metre /20 inches of mulch around each citrus tree. Need to find more to finish off the bank.
Concretor was back today, area for greenhouse pad is boxed up with reinforcing mesh over 60% of it. Should enable us to spread the 7 cube load that will arrive here tomorrow and enough mesh is on site to quickly fill in the rest of the pad if we can score a second truckload.